2026 MRE for Brama-Alba-Melonal-Copete-Porotillo

The October 2026 Mineral Resource estimate (MRE) is 464Mt at 0.42g/t AuEq for 6.2Moz gold-equivalent. The 2026 MRE was a 72% or 2.6Moz increase on the 2025 maiden MRE.

The Resource is limited to the pit-constrained Brama-Alba-Melonal porphyry deposits and Copete-Porotillo porphyry deposits. It does not include mineralisation outlined at several other targets within the Bramaderos concession. 

Bramaderos Mineral Resource estimate at 0.3g/t AuEq cut-off grade

- Due to the effect of rounding, the total may not represent the sum of all components
-- A reporting cut-off grade of 0.3 g/t AuEq was adopted.
--- Metal equivalent recovery assumptions are supported by metallurgical test work.

Mineral Resource estimate at various cut-off grades