Figure 5: Distribution of copper (shown in ppm; 2000ppm = 0.2%) in drillholes at El Palmar. Assays are pending for holes 18 and 19 (yellow traces) whilst hole 20 (red trace) recently completed. SUNSTONE METALS LIMITED ANNUAL REPORT 2022 11 Sunstone Metals Limited Annual Report 2022
RkJQdWJsaXNoZXIy MjE2NDg3